Size check
The figure stands 5 ft 9 in (1.75 m). Choose a different size and the drawing redraws to match.
Included as standard
- Full-colour UK printing, produced only once you order
- Uploaded artwork gets a free check by one of our team (size, bleed, resolution)
- Send a print-ready PDF, or have us prepare the artwork
- Sent by courier, or collect from our Manchester office (M8)
Construction Traffic Arrow Left Sign in Manchester
A construction traffic arrow left sign sends site lorries, plant and contractors' vans to the left at a junction on a Manchester housing scheme, keeping them off roads residents now use. From £28.73. Production takes 2 working days on Express, 3 on Standard or 5 on Saver. Courier delivery £7.95, or free collection from M8.
On a phased estate, the people who bought the first houses still live next to a building site. Clear arrows send works traffic one way and keep residents' streets quiet, which keeps complaints down and sales up.
Running a charity, school, club or place of worship? up to 10% off each orderBusiness? up to 5% off the first order
About this product
As a big housing scheme moves from phase to phase, the haul road changes. Drivers who learned the route last month take the old way, straight past occupied homes and children's play areas.
A phased housing scheme in Golborne, Greater Manchester
Picture a development of several hundred homes in Golborne, with phase one occupied and phase two under way. Construction traffic should turn left at the first junction inside the estate onto a temporary haul road; residents turn right. An A1 arrow at that junction, facing incoming lorries and readable from around 24 m, makes the split obvious. A2 repeaters at the next junctions keep drivers on track.
The mistake
Leaving old arrows up after the haul road moves. An arrow pointing to a route that no longer exists sends a 32-tonne tipper down a cul-de-sac. Walk the route at the start of each phase and move or remove signs as needed.
Board and size
Correx is the usual board for haul road signs: light, waterproof, easy to move on stakes or barriers as the site changes. A1 suits the main junction; A2 the repeaters.
The opposite turn is covered by the construction traffic arrow right sign, and the plain version without an arrow suits a straight approach.
Prices start at £28.73. Add a site name or "Phase 2" by uploading artwork; every upload is checked automatically free, or we typeset for £15. Production is 5 working days, then a tracked courier, usually 1 to 3 working days, at £7.95, free over £100. Collect from our Manchester office (Unit 3-C, 116 Bury New Road, Manchester M8 8EB) once our email confirms. See site direction signs.
Manchester Printed is based in Manchester and delivers across the UK, covering the city, its suburbs and towns like Oldham. Collection from our Manchester office costs nothing once your order is ready.
Price by size
Listed from the smallest up. Choosing a price sets that size in the buy box for you.
| Size | 3.5mm Correx | 3mm Foamex | 3mm Dibond aluminium composite |
|---|---|---|---|
| A3 landscape · 420 × 297 mm | |||
| A2 landscape · 594 × 420 mm | |||
| A1 landscape · 841 × 594 mm |
Final prices per item with the lowest-priced options. UK delivery £7.95, free over £100. Choose a price to load it into the price calculator.
Specification
What it is made from, the sizes on offer and how it is finished.
| Message | Construction Traffic Arrow Left |
|---|---|
| Sign type | Text |
| Materials | 3.5mm Correx, 3mm Foamex and 3mm Dibond aluminium composite |
| Sizes | A3 landscape (420 × 297 mm), A2 landscape (594 × 420 mm), A1 landscape (841 × 594 mm) |
| Viewing distance | A3 landscape: 12 m, A2 landscape: 17 m, A1 landscape: 24 m |
| Full colour, single sided | |
| Made by | Made to order for Manchester Printed, Manchester, and file-checked by our Manchester team |
| SKU | MP-SIT-060 |
| Price | The configurator shows the final price, and checkout matches it. |
| Delivery | UK mainland £7.95 per order, free over £100. Highlands +£10. Islands and Northern Ireland: ask for a price. |
| Artwork check | Automatic file check on uploaded artwork (resolution, size and bleed). |
What size should I order?
Pick a size people can read from where they will stand. As a cautious rule, using the distance-factor method in ISO 3864-1, allow roughly 1 metre of reading distance per 25 mm of sign height (measured on the shorter side). Check it against your own risk assessment.
| Size | Can be read from about |
|---|---|
| A3 landscape (420 × 297 mm) | 12 m |
| A2 landscape (594 × 420 mm) | 17 m |
| A1 landscape (841 × 594 mm) | 24 m |
Good lighting stretches the reading distance; in dim spots, go a size up.
Your design
Three routes to print-ready artwork. Pick whichever suits you.
Send your own file
Make the PDF at the ordered size plus 3 mm bleed on each edge. Someone on our team looks over every upload, free of charge, before printing starts.
Use the designer
This one needs a ready-made file rather than the designer. Stuck? We can prepare the artwork for you.
Let us do it
Choose typesetting, or a design worked up from your brief, when you reach the artwork step. File set-up advice.
FAQs
Short answers on ordering construction traffic arrow left sign in manchester.
How often should I check the arrows?
At every change of route, and whenever a phase starts.
A1 or A2?
A1 at main junctions, A2 for repeaters.
Can Greater Manchester housebuilders order whole route sets?
Yes. Use the quote form for big sets.
Customer questions
No reviews yet.
Review Construction Traffic Arrow Left Sign
How we handle reviews
Reviews come only from customers who bought the product. We match each one to a real order and label it "Verified owner".
Every genuine review goes up as written, good or bad. We do not edit reviews or pick favourites. We only hold back spam, abuse, or reviews containing personal details such as a phone number or email address.
Stars are the average of all published reviews. Nobody is paid, discounted or given gifts for a review.
A review shows its writer’s first name and initial. If you want your own review removed, contact us.
Ordering tips
Every support articleBuy with confidence
A real company, a real address and a real person on the phone.
Who we are
FAT PRINT LTD
Registered in England and Wales, company no. 17494787
Unit 3, 116 Bury New Road, Manchester M8 8EB
Refund promise
Change your mind before we print and we refund you in full. Faulty, damaged or wrong items are put right or refunded.
Secure payment
Card payments are handled by Stripe. We never see or store your card number.




